Skip 133 is on site, but not quite filled as there were only 10 volunteers on site today. However, despite this we did very well with the current ongoing work which is to level out the floor of Level 4 and of course pump out the many gallons of crystal clear water from the bottom of the now very deep cavern.

The pumping is now going quite well, we have been donated a couple of extra pumps, which is great news, so we have been able to tweak our pumping system. This now means we and are able to pump out many gallons of this very clean water with as little human involvement as possible leaving more manpower for removing the infill.